摘要
The reinforcement effect of a reconstruction scheme for a steel factory building was investigated using finite element method and dynamic performance test. The workshop concerned is a portal frame structure with four spans and two slope roofs, of which ten columns need cutting for expanding span. The design and reconstruction project of column-cut supported by joist were introduced, which includes column reinforcement, connection rebuilding between brackets and crane beams, and the changing of rigid joint into hinge joint. The construction scheme was put forward in the light of the characteristics of the reinforcement and reconstruction. Spot test of dynamic performance on the workshop and comparison with theoretical analysis results show that the column-cut supported by joist design is effective and the reconstruction project is successful.
The reinforcement effect of a reconstruction scheme for a steel factory building was investigated using finite element method and dynamic performance test. The workshop concerned is a portal frame structure with four spans and two slope roofs, of which ten columns need cutting for expanding span. The design and reconstruction pro- ject of column-cut supported by joist were introduced, which includes column reinforcement, connection rebuilding between brackets and crane beams, and the changing of rigid joint into hinge joint. The construction scheme was put forward in the light of the characteristics of the reinforcement and reconstruction. Spot test of dynamic performance on the workshop and comparison with theoretical analysis results show that the column-cut supported by joist design is effective and the reconstruction project is successful.
基金
Supported by Program for New Century Excellent Talents in University (No. NCET-06-0228)