摘要 The reinforcement effect of a reconstruction scheme for a steel factory building was investigated using finite element method and dynamic performance test. The workshop concerned is a portal frame structure with four spans and two slope roofs, of which ten columns need cutting for expanding span. The design and reconstruction project of column-cut supported by joist were introduced, which includes column reinforcement, connection rebuilding between brackets and crane beams, and the changing of rigid joint into hinge joint. The construction scheme was put forward in the light of the characteristics of the reinforcement and reconstruction. Spot test of dynamic performance on the workshop and comparison with theoretical analysis results show that the column-cut supported by joist design is effective and the reconstruction project is successful. The reinforcement effect of a reconstruction scheme for a steel factory building was investigated using finite element method and dynamic performance test. The workshop concerned is a portal frame structure with four spans and two slope roofs, of which ten columns need cutting for expanding span. The design and reconstruction pro- ject of column-cut supported by joist were introduced, which includes column reinforcement, connection rebuilding between brackets and crane beams, and the changing of rigid joint into hinge joint. The construction scheme was put forward in the light of the characteristics of the reinforcement and reconstruction. Spot test of dynamic performance on the workshop and comparison with theoretical analysis results show that the column-cut supported by joist design is effective and the reconstruction project is successful.
出处 《Transactions of Tianjin University》 EI CAS 2010年第3期216-222,共7页 天津大学学报(英文版)
基金 Supported by Program for New Century Excellent Talents in University (No. NCET-06-0228)
关键词 steel factory building column-cut supported by joist dynamic test modal analysis finite element analysis 动态性能测试 加固效果 格栅 评价 有限元方法 改造方案 框架结构 钢铁厂
  • 相关文献

参考文献11

  • 1张桂琴.抽柱换梁改造的设计与施工[J].山西建筑,2003,29(1):76-77. 被引量:4
  • 2Kishi N, Chen W F. Design aid of semi-rigid connections for frame analysis [J]. Engineering Journal, 1998, 30 (3) : 90-107.
  • 3Nesalsov O. Column stability increasing on steel structure reconstruction[J]. Stability of Steel Structures, 1991, 5(3): 145-152.
  • 4de Lorenzis Laura, Nanni Antonio. Bond between nearsurface mounted fiber-reinforced polymer rods and concrete in structural strengthening[J]. ACI Structural Journal, 2002, 99(2): 123-132.
  • 5Sherbourne A N, Bahaari M R. Finite element prediction of end plate bolted connection behavior ( II ) : Analytic formulation [J].Journal of Structural Engineering, 1997, 123 (2) : 165-175.
  • 6Sherbourne A N, Bahaari M R. Finite element prediction of end plate bolted connection behavior ( I ): Parametric study [J]. Journal of Structural Engineering, 1997, 123 (2) : 157-164.
  • 7Sherbourne A N, Bahaari M R. 3D simulation of end-plate bolted connections [J]. Journal of Structural Engineering, 1994, 120 (11): 3122-3136.
  • 8冯艳霞.机械厂房抽柱工程实践[J].机械工程与自动化,2004(2):75-76. 被引量:3
  • 9宋发,景建国,曹铁健.托梁截柱施工及监测技术[J].工业建筑,1995,25(5):16-19. 被引量:5
  • 10Li Yuanping. The Firm-Beam-Move-Pillar method for reformation of old workshop buildings [J]. Journal of Jinan University (Natural Science), 2003, 24(3): 66-69 (in Chinese).