摘要
某银金矿尾矿库已运行多年,现依据相关要求需进行主坝稳定性分析。本文介绍了该矿的特点,进行了坝体稳定以及其他现状分析,提出了具体的加固措施,为日后尾矿库的管理和设计提供了依据。
A silver gold mine tailings pond has been in operation for years, main dam stability analysis needs to be made according to relevant requirements. The paper introduces characteristics of the mine, analyzes dam body stability and other status, puts forward detailed reinforcement measures and provides basis for management and design in the future.
出处
《江西冶金》
2010年第2期8-10,14,共4页
Jiangxi Metallurgy
关键词
尾矿库
主坝
稳定性分析
加固措施
降低浸润线
压坡
tailings pond
main dam
stability analysis
reinforcement measure
lowering of phreatie line
pressure slope