期刊文献+

A new algorithm for stope boundary optimization 被引量:1

A new algorithm for stope boundary optimization
下载PDF
导出
摘要 Stopes can be simply defined as an underground opening from which ore has been excavated.Selection of the best combination of available stope boundary will directly affect the profitability of the operation.While a few attempts has been initiated to generate the optimum stope boundary for underground mining, they fail to guarantee a true optimality in three-dimension block models.This paper proposed a new methodology which can find optimum stope layout for a given resource model in three-dimensions.The paper initially critically reviewed important stope boundary optimisation studies thus far, then proposed a new methodology in order to find the best stope layout for a given deposit.Subsequently it applied the proposed methodology into a block model to test its ability of producing optimum results and demonstrated its applicability in a number of different scenarios.In the last section, further analysis on strategies to find the optimum stope boundaries were demonstrated.The results prove that the proposed algorithm can find optimum stope boundaries and layouts in three-dimension for different stope sizes and stope selections trategies. Stopes can be simply defined as an underground opening from which ore has been excavated. Selection of the best combination of available stope boundary will directly affect the profitability of the operation. While a few attempts has been initiated to generate the optimum stope boundary for underground mining, they fail to guarantee a true optimality in three-dimension block models. This paper proposed a new methodology which can find optimum stope layout for a given resource model in three-dimensions. The paper initially critically reviewed important stope boundary optimisation studies thus far, then proposed a new methodology in order to find the best stope layout for a given deposit. Subsequently it applied the proposed methodology into a block model to test its ability of producing optimum results and demonstrated its applicability in a number of different scenarios. In the last section, further analysis on strategies to find the optimum stope boundaries were demonstrated. The results prove that the proposed algorithm can find optimum stope boundaries and layouts in three-dimension for different stope sizes and stope selection strategies.
出处 《Journal of Coal Science & Engineering(China)》 2010年第2期113-119,共7页 煤炭学报(英文版)
关键词 采场布局 模型优化 边界 算法 最优模型 经营利润 最佳组合 地下采矿 Stope design, optimisation, underground mining, stope layout algorithm
  • 相关文献

参考文献18

  • 1Alford C, 1995. Optimisation in underground mine design, 25th International APCOM Symposium, Melbourne. The Australian Institute of Mining and Metallurgy, 213-218.
  • 2Alford C, Brazil M, Lee D H, 2007. Optimisation in underground mining, in Handbook of Operations Research in Natural Resources, 561-577.
  • 3Alford C, Hall B, 2009. Stope optimisation tools for the selection of optimum cut-off grade in underground mine design,Proceedings of project evaluation conference, Melbourne, 137-144.
  • 4Ataee-pour M, 2004. Optimisation of stope limits using a heuristic approach. Mining Technology, 113:123-128.
  • 5Ataee-pour M, 2005. A critical survey of the existing stope layout optimization techniques, Journal of Mining Science, 41 : 447-466.
  • 6Brazil M, Grossman P A, 2003. Grossman, access layout optimisation for underground mines, Australian Mining Technology Conference, Queensland, Australia, 119-128.
  • 7Brazil M, Lee D H, Van Leuven M, Rubinstein J H, Thomas D A, Wormald N C, 2003. Optimising declines in underground mines, mining technology. Trans. of the Institution of Mining and Metallurgy, Section A, 112:164-170.
  • 8Cawrse I, 2007. Multiple pass floating stope process, Strategic Mine Planning Conference. Perth, Australia, 87-94.
  • 9Dimitrakopoulos R, Grieco N, 2009. Stope design and geological uncertainty: quantification of risk in conventional designs and probabilistic alternative, Journal of Mining Science, 45(2): 152-163.
  • 10Grieco N, Dimitrakopoulos R, 2007. Managing grade risk in stope design optimisation: probabilistic mathematical programming modal and application in sublevel stoping, Mining technology, 116: 49-57.

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部