摘要
结合张峰水库工程实际,对大坝监测仪器埋设、监测仪器电缆的敷设、施工期观测和数据整理分析等作简单介绍,通过仪器埋设过程的有效控制,达到较好的仪器成活率。
Combining with Zhangfeng Reservoir's project practice,the article briefly introduces burying monitoring instruments in dam body,laying electric cables of these instruments,observating in construction period and compiling abservation data.Through effectively controlling burying process of these instruments,the good survival rate to bury instruments is obtained.
出处
《山西水利科技》
2010年第2期84-85,96,共3页
Shanxi Hydrotechnics
关键词
张峰水库
监测仪器
埋设
控制
Zhangfeng Reservoir
monitoring instrument
burying
control