摘要 对汶川地震中底层框架震损或倒塌而其它层破坏较轻的框架结构和底框结构房屋的破坏原因进行了分析,为了避免该类结构需推倒重建造成的经济损失,提出了将隔震和消能减震技术应用于该类震损结构中的加固新方法——断柱装垫法,给出了基底断柱装垫、层间断柱装垫和层间断柱装垫加消能减震三种方案。结合某工程算例,对底层破坏的框架结构采用上述3种方案进行了分析,结果表明,采用断柱装垫方法加固底层框架震损而其它层破坏较轻的框架结构是可行的,并且加固后的结构抗震性能得到明显的改善,能达到新的抗震设防要求。 The damage characteristics and causes of the structures whose ground floor were suffered damage and the other floors were minor ones in WenChuan earthquake are studied, a suitable method of seismic retrofitting for this kind of damaged structures which cuts off the bottom damage columns and adds isolators is proposed. Three schemes are included in the method, they are removing the bottom story columns and adding isolators, cutting off the bottom damaged columns and adding isolators, the same with scheme 2 but with energy dissipation devices. This kind of damaged buildings could be reused due to the adoption of the method, so the reconstruction expense of disaster area is saved. Based on an engineering example, the above three schemes are analyzed. The analysis results indicate that the proposed retrofitting method is valid, and the structural seismic behavior of the damaged building could be obviously improved to meet the new earthquake fortification requirements of seismic code.
出处 《工程抗震与加固改造》 北大核心 2010年第2期112-121,共10页 Earthquake Resistant Engineering and Retrofitting
关键词 断柱装垫加固 震损结构 隔震 消能减震 seismic retrofitting method by cutting off the bottom damage columns and adding isolators Earthquake damaged structure Seismic isolation energy dissipation
  • 相关文献

参考文献5

二级参考文献27

共引文献464

同被引文献44

引证文献3

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部