摘要
山海关造船重工有限公司西区造船坞工程具有工期紧、工程量大、施工强度高、结构复杂多样等特点。在项目施工过程中,采取有针对性的项目管理和质量控制措施,有效地进行了施工控制,保证了工程质量和施工进度,取得了良好的实施效果。
Building dock project of Shauhaiguan Shipbuilding Heavy Industry Co., Ltd. is characterized by tight schedule, large engineering quantity, high construction strength, as well as complex and diverse structures. During construction, we adopted specific project management and quality control measures to control the construction effectively and ensure the project quality and construction progress.
出处
《水运工程》
北大核心
2009年第A12期66-70,共5页
Port & Waterway Engineering
关键词
造船坞
质量
控制
building dock
quality
control