江西九瑞高速公路项目40m预应力T梁预制工艺过程控制

Control of precast process of 40 m prestressed T-beam for Jiangxi Jiurui Expressway
下载PDF
导出
摘要 对40m预应力T梁施工工艺流程进行阐述,并对高速公路施工工期较紧、质量要求较高的T梁预制工艺过程控制进行总结。其中:预制台座两侧的优化设计是T梁底部止浆的新型处理方式;T梁腹板、侧模板的支拆及“马蹄”部分混凝土振捣密实是T梁预制的施工控制难点;冬季低温条件下如何采取有效的保温措施是保证梁体整体质量、加快模板周转、提高工效的关键所在。 This paper elaborates the technological process of 40 m prestressed T-beam precasting process of T-beam of high quality demands and under tight schedule. The optimum of precast pedestal is the new treatment method for stopping grouting for the T-beam botto dismantling of T-beam web and side form and vibrating and compacting of horseshoe concrete and summarizes the design of both sides m; the erection and is the difficult point of construction control of T-beam precasting; the effective insulation measure under low temperature in winter is the key to ensure the integral quality of beam body, accelerate the turnover of templates and improve the efficiency.
出处 《水运工程》 北大核心 2009年第A12期130-135,共6页 Port & Waterway Engineering
关键词 台座优化 模板工艺 混凝土振捣 养生 张拉 压浆 pedestal optimization template technology concrete vibration curing tension grouting
  • 相关文献

参考文献5

  • 1JTG F80/1-2004,公路工程质量检查评定标准[S].
  • 2JTGH11-2004.公路桥涵养护规范[S].[S].,..
  • 3JTG D26-2004,公路钢筋混凝土及预应力混凝土桥涵设计规范[S].
  • 4叶见曙.结构设计原理[M].北京:人民交通出版社,2006.
  • 5李关寿.横张预应力混凝土桥梁设计施工指南[M].北京:人民交通出版社,2005:36-39.

共引文献329

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部