2DAVID R P. A new job shop scheduling heuristic[D]. Houston,USA:The University of Houston,1998.
3WIENDAHL H P. Load-oriented manufacturing control[M].Munchen,Germany:Carl Hanser Verlag, 1999.
4TAILLARD E. Bechmarks for basic scheduling problems[J].European Journal of Operations Research, 1993,64(2): 278-285.
5LOURENCO H. Job shop scheduling: computational study of local search and large step optimization methods[J]. European Journal of Operations Research, 1995, 83: 347-364.
6LAWRENCE S R, BUSS A H. Economic analysis of production bottlenecks[J]. Mathematical Problems in Engineering.1995,1(4) :341-363.
7CHIANG S Y. Bottlenecks in production systems with mark ovian machines: theory and applications[D]. MI, USA: The University of Michigan,1999.
8BALAS E, VAZACOPOULOS A. Guided local search with shifting bottleneck for job shop scheduling[J]. Management Science, 1998,44(2) :262-275.