摘要
三峡枢纽进入试运行期后,由于三峡电站调峰造成三峡坝区水位波幅较大,对航运条件产生一定影响。文章分析了三峡水库投入使用后对两坝间航运设施的影响,并提出了相应的工程改造措施。
With the Three Gorges Reservoir's trial operation,the water level fluctuation of the Reservoir is bound to have an impact on the shipping condition of ports concerned.In the paper,the influence of Three Gorges Reservoir's operation on the shipping facilities located at the reaches between Gezhouba Dam and Three Gorges Dam has been analyzed and the corresponding countermeasures concerning the reconstruction of project has also been presented.
出处
《南通航运职业技术学院学报》
2010年第1期72-74,共3页
Journal of Nantong Vocational & Technical Shipping College
基金
交通部西部交通建设科技项目"三峡-葛洲坝枢纽河段航运条件及航运调度规程技术研究"(项目编号:200732800087)
关键词
三峡枢纽
调峰
港口设施
对策
Three Gorges
Running
Ports' facilities
Countermeasures