地震灾区灾后重建项目的工程造价控制对策研究 被引量:1

The Research of Countermeasures of Controlling Post- earthquake Reconstruction Cost
下载PDF
导出
摘要 通过分析地震灾区灾后重建工程造价控制存在的建筑市场主体不成熟、工程量清单认识不足等问题,探讨灾后重建工程造价影响因素,并对灾后重建工程造价控制提出相应对策建议。 Through the analysis of earthquake post-disaster reconstruction, the article analyzes some problems, such as:the immaturity of the body of construction market and misunderstanding of project list. Then the article discusses some influencing factors of the cost of the reconstruction. Therefore ,the article puts forward some suggestions and countermeasures of controlling post-earthquake reconstruction cost.
出处 《沈阳建筑大学学报(社会科学版)》 2010年第2期191-194,共4页 Journal of Shenyang Jianzhu University:Social Science
基金 住房和城乡建设部科学技术计划项目(08-K1-9)
关键词 灾后重建 造价控制 建设管理 reconstruction of the post-disaster construction cost control construction management
  • 相关文献

参考文献5

二级参考文献26

  • 1黄定轩,尤建新,杜波.不同结局建筑施工项目关键因素实证分析[J].土木工程学报,2006,39(12):112-118. 被引量:9
  • 2Sambasivan M, Soon Y W. Causes and effects of delays in Malaysian construction industry [J]. International Journal of Project Management,2007,25 (5) :517 -526
  • 3Hubbard D G. Successful utility project management from lessons learned[J].Project management Journal, 1990,21 ( 3 ) : 19 - 23
  • 4[美]弗雷德里克E.古尔德,南希E.乔伊斯.工程项目管理[M].孟宪海,译.北京:清华大学出版社,2006
  • 5Walker D H T. An investigation into construction time performance [ J]. Construction Management and Economics, 1995,13 (3) : 253 -274
  • 6Chan A P C, Scott D, Chan A P L. Factors affecting the success of a construction project[J].Journal of Construction Engineering and Management,2004,130 ( 1 ) : 153 - 155
  • 7Bromilow F G. Contract time performance expectations and the reality[J].Building Forum, 1969,1 (3) :70 - 80
  • 8Ireland V B E. The role of managerial actions in the cost, time and quality performance of high rise commercial building projects[J].Constraction Management and Economics 1985,3(1) :59 -87
  • 9Nkado R N. Construction time - influencing factors : the contractor's perspective [ J ]. Construction Management and Economics, 1995,13 (1):81 -89
  • 10Chan D W M, Kumaraswamy M M. Compressing construction durations:lessons learned from Hong Kong building projects [ J ]. International Journal of Project Management,2002,20 ( 1 ):23 -35