摘要 通过研究百米钢轨冷却的边界条件,采用三维瞬态非线性有限元法计算分析了百米U75V平直钢轨矫直前冷却过程中的弯曲变形变化规律。结果表明,平直钢轨在冷却过程中的弯曲变形是一个循环反复的过程,但钢轨最终是弯向轨头的;在考虑钢轨与冷床摩擦作用的情况下,平直钢轨终冷后,其变形特点是中间平直、两端弯曲,端部弯曲范围约为18 m。 The regularity of bending of 100 m U75V steel straight rail during cooling process before straightening has been calculated by analyzing the boundary conditions of cooling of 100 m rail and using three-dimensional instantaneous non-linear finite element method. Results show that the bending deformation of the straight steel rail during cooling process is a repeat-cycling process, but the rail eventually is bent to the rail head; with considering the friction between steel rail and cooling bed, after the straight steel rail finishing cooling the deforming feature of rail is straight at middle part, bent at both ends and scope of bent ends covering 18 m.
出处 《特殊钢》 北大核心 2010年第3期14-15,共2页 Special Steel
基金 包头市重大科技攻关资助项目(2006Z1006)
关键词 百米U75V钢轨 矫直前钢轨弯曲度 有限元法 100-m U75V Steel Rail, Bending of Rail before Straightening, Finite Element Method
  • 相关文献

参考文献4

二级参考文献5

  • 1李曼云 孙本荣.钢的控制轧制和控制冷却技术手册[M].北京:冶金工业出版社,1998..
  • 2Basu J. Rail Behaviour during Cooling After Hot Rolling. The Journal of Strain Analysis for Engineer Design ,2004,39 ( 1 ) :15.
  • 3Lenard J G. A Study of Temperature Distribution in Rails during Intermittent Cooling. Journal of Materials Processing Technology, 1991,25 (3) :303.
  • 4罗林.高速铁路轨道必须具有高平顺性[J].中国铁路,2000(10):8-11. 被引量:57
  • 5胡盛德,杭乃勤,韩传伟.重轨断面温度场的FEM模拟[J].武汉科技大学学报,2003,26(3):224-226. 被引量:1

共引文献36

同被引文献33

引证文献8

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部