大红山铜矿矿柱的稳定性与岩体强度 被引量:1

Pillar stability and strength of rockmass of Dahongshan copper mine
下载PDF
导出
摘要 对影响大红山铜矿矿柱稳定性主要原因进行了分析。发现影响矿柱稳定性的主要因素是充填欠账导致岩体强度的下降,以及断层等软弱结构面的存在。根据少量矿柱垮塌的情况和岩石试块力学试验结果得出,未垮塌地段岩体的单轴抗压强度在40MPa以上。在岩体强度较高的矿体东部,当矿柱高度较低时,可以将原设计8m的矿柱厚度降低为5m,以提高资源回收率。 Analyzing was performed for the reason of influencing the stability condition of the pillars of Dahongshan copper mine. It is found that the main factors influencing pillar stability are the descending of the rock strength caused by the lag of the backfilling, and the existance of the planes of weaknesses. It is concluded from some failed pillars and test results of rock samples that the un-axial compressive strength of the rock mass (unfailure pillar) is over 40MPa; and the pillar thickness could reduce from 8m to 5m for short pillars at east part of the ore body where rock is relatively stable.
作者 刘关锋
出处 《企业技术开发》 2010年第2期89-91,共3页 Technological Development of Enterprise
关键词 矿柱 稳定性 充填 结构面 岩体强度 rock pillar stability filling planes of weaknesses strength of rock mass
  • 相关文献

参考文献7

  • 1昆明有色冶金设计研究院,易门矿务局.大红山铜矿采矿方法试验采区稳定性研究岩石物理力学性质试验报告[R].昆明:昆明理工大学,2001.
  • 2玉溪矿业公司大红山铜矿.大红山铜矿435中段矿岩力学性质试验研究报告[R].昆明:昆明理工大学,2008.
  • 3Muller.岩石力学[M].北京:煤炭工业出版社,1980.
  • 4玉溪矿业公司大红山铜矿.大红山铜矿435中段12矿体采场结构参数优化研究与顶板稳定性监测研究报告[R].昆明:昆明理工大学,2009.
  • 5Hoek.E,Brown.ET.Practical estimates of rock mass strength [J].International Journal of Rock Mechanics and Mining Sciences.1997,34(8) : 1165-1186.
  • 6郑泽岱,刘沐宇,祝文化.矿柱强度估算及稳定性评价[J].武汉工业大学学报,1993,15(3):59-67. 被引量:15
  • 7吴东旭.大红山铜矿岩体结构调查分析[J].云南冶金,2007,36(4):9-12. 被引量:2

二级参考文献3

  • 1邢念海.国内外围岩分类概况[J].地下工程,1980,(5):52-59.
  • 2吴洪词.采动岩体结构分析[J].中国矿业大学学报,1998,27:150-152.
  • 3Zhang Q.et al.Application of Neural network models to Rock Mechanics and Rock Engineering[J].Int.J.RockMechanics and Mining Science.1991,28,(6):.

共引文献15

同被引文献129

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部