摘要
结合辽宁红沿河核电厂取水隧洞工程实例,参阅其它工程资料,分析了隧洞结构的工作特性。考虑隧洞工程所处地质环境的复杂性以及施工方法的差异性,总结、归纳了隧洞在不同条件下适宜采取的计算模型及设计方法,以供类似其它工程参考。
In accordance with the intake tunnel project in Hongyanhe Nuclear Power Plant and other information, this paper analyzes the operational factors of tunnel structure. In view of the complexity of geological environment and the difference of eonstruction, computing models and design methods, as a reference for other projects, under different conditions are summarized.
出处
《黑龙江电力》
CAS
2010年第2期118-122,共5页
Heilongjiang Electric Power
关键词
隧洞
工作特性
计算模型
设计方法
tunnel
operational factors
computing model
design method