期刊文献+

云广±800kV直流输电工程换流变压器现场安装关键技术 被引量:5

Key Techniques for Converter Transformer's Field Installation in Yunnan-Guangdong ±800 kV DC Transmission Project
下载PDF
导出
摘要 基于云广±800kV直流输电工程穗东换流站高端换流变压器现场安装试验,包括阀侧升高座出线装置安装、阀侧套管安装、散热器安装和换流变压器油处理等,对±800kV直流换流变压器现场安装环境条件、安装的关键技术及其与常规换流变压器安装的差异等进行了探讨。 Based on the field installation of ± 800 kV converter transformers in Suidong Converter Station of Yunnan-Guangdong ±800 kV DC transmission project, including the installations of valve bushing turrets, valve bushings, coolers and the transformer oil treatment, this paper discusses the environment condition and the key techniques of the installation as well as the differences between the installations of the ± 800 kV converter transformer and the conventional HVDC transformer.
作者 李扬 汪洋
出处 《南方电网技术》 2010年第2期79-81,共3页 Southern Power System Technology
关键词 特高压直流输电 换流变压器 现场安装 UHVDC transmission converter transformer field installation
  • 相关文献

参考文献1

  • 1Siemens AG.Operating and Installation Instructions for Transformer[]..2009

同被引文献23

引证文献5

二级引证文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部