对220kV跨海高塔线路沿直线绝缘子串进入电场进行带电作业的安全性和可行性进行验证,解决高塔带电作业进入电场的路径问题;研究适用于高塔带电作业的方法和作业工具,以提高工作效率,减轻作业人员的劳动强度,解决了高塔带电检修长期无法开展的难题。
The security and feasibility of entering electric field for live working along linear insulator string of high tower on 220 kV sea-crossing transmission line are verified, and the problem of path selection for entering the electric field is solved. Methods and tools for live working on high tower are studied to improve work efficiency and reduce labor intensity, thus solving the long-standing difficulty of live maintenance on high tower.