湿陷性黄土隧道三台阶法施工时间应变规律 被引量:7

Rule of Time-dependent Stress of Tunnels in Wet Subsidence Loess Constructed by 3-bench Excavation Method
下载PDF
导出
摘要 通过对湿陷性黄土围岩监测,揭示时间应变规律,结合此规律形成一套三台阶施工工法,并总结出使用此工法施工围岩的变形特性如下:上台阶开挖后稳定7 d左右,表现为沉降,在施工二台阶马口时,允许上台阶初期支护在可控范围内下沉,也是应力释放的过程;三台阶施工沉降变形规律与二台阶类似,在仰拱封闭后,围岩趋于稳定。 The rule of the time-dependent strains of the tunnels in wet subsidence loess ground is revealed by means of monitoring of the wet subsidence loess ground. A kind of 3-bench construction method is developed on basis of the rule of the time-dependent strains. The deformation behavior of the tunnels constructed by 3-bench excavation method is summarized as follows : After top heading excavation, the tunnel stability can maintain 7 days before settlement occurs ; During the excavation of the second bench, the controlled settlement of the primary reinforcement structure of the top heading is allowed, which is a stress releasing process; The settlement deformation caused by the third bench excavation is similar to that caused by the second bench excavation; When the ring is closed after invert installation, the ground tends to be stable. 3-bench construction is executed under the guidance of the above deformation rule in the construction of Lanzhou-Chongqing railway and satisfactory effects have been achieved.
出处 《隧道建设》 2010年第2期128-130,189,共4页 Tunnel Construction
关键词 湿陷性黄土 隧道 三台阶法 时间应变规律 wet subsidence loess tunnel 3-bench method rule of time-dependent stress
  • 相关文献

参考文献6

二级参考文献6

  • 1丁进文,薛长武.青山隧道施工控制及质量加固[J].公路,2004,49(7):174-176. 被引量:5
  • 2JYJ042-94.公路隧道施工技术规范[S].
  • 3铁道部经济规划研究院.客运专线铁路隧道工程施工技术指南[M].北京:中国铁道出版社,2005.
  • 4黄成光.公路隧道施工[M].北京:人民交通出版社,2002..
  • 5大跨度地下洞室开挖动态力学特性及支护设计研究[J].化工矿山技术,1996,26:17-17.
  • 6柴颖鹏.浅谈隧道施工中的关键要素[J].山西建筑,2008,34(12):321-322. 被引量:15

共引文献196

同被引文献46

引证文献7

二级引证文献29

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部