高地应力千枚岩地层斜井进正洞岔口地段施工技术 被引量:5

Construction Technology for Connection Section between Inclined Shaft and Main Tunnel in Phyllite Ground with High Ground Stress
下载PDF
导出
摘要 结合兰渝铁路西秦岭隧道高地应力千枚岩地层斜井进正洞岔口地段施工技术及变形处理的工程实践,分析千枚岩地层走向与变形的关系,总结径向注浆、临时支撑等变形处理措施,有效地抑制围岩变形,同时,对该类围岩的施工技术参数及断面设计提出建议,对类似围岩地段的变形防治提供参考。 The relationship between the strike of the phyllite ground and the deformation of the tunnel is analyzed and the deformation control measures, including radial grouting and temporary support, are summarized in the paper, with the construction and deformation control of the connection section between the inclined shaft and the main tunnel of West Qinling tunnel on Lanzhou-Chongqing railway in phyllite ground with high ground stress as an example. Suggestion is also made on the technical parameters and cross-section design of such works in such ground conditions. The paper can be served as reference for similar projects in the future.
出处 《隧道建设》 2010年第2期206-211,共6页 Tunnel Construction
关键词 高地应力 千枚岩地层 斜井 正洞 岔口地段 high ground stress phyllite ground inclined shaft main tunnel connection section
  • 相关文献

参考文献9

二级参考文献29

共引文献79

同被引文献18

引证文献5

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部