期刊文献+

木寨岭隧道有轨斜井断面选择及装碴运输设备选配 被引量:3

Selection of Cross-sections and Muck Loading and Transportation Equipment for Inclined Shafts of Muzhailing Tunnel with Track Transportation System
下载PDF
导出
摘要 通过对兰渝铁路木寨岭隧道3#及4#有轨斜井的断面优化及斜井装运设备的实践总结,从现场实际施工的角度,提供了小断面、主副双井型有轨斜井的断面选择方法,并对有轨斜井施工设备的选型进行了探讨,为以后类似工程的断面设计和施工配套设备选型提供借鉴。 The cross-section optimization and equipment selection for No. 3 and No. 4 inclined shafts of Muzhailing tunnel are presented. In the end, the mode of main inclined shaft and assistant inclined shaft with small cross-sections is adopted. Discussion is also made on the selection of the construction equipment for the inclined shafts with track transportation system. The paper can be served as reference for similar projects in the future.
出处 《隧道建设》 2010年第2期216-219,共4页 Tunnel Construction
关键词 隧道 有轨斜井 断面选择 装运提升设备 tunnel inclined shaft with track transportation system cross-section selection equipment for loading,transportation and hoisting of mucks
  • 相关文献

参考文献5

二级参考文献27

共引文献50

同被引文献26

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部