以湖北白莲河抽水蓄能电站500kV电缆工程施工为实例,提出电缆高落差敷设所遇到的问题和解决办法,并对比目前110kV、220kV电缆终端的组装,指出500kV电缆终端组装施工在进度控制、管理及工艺方面的优点。
Taken the 500kV cable laying engineering of Hubei Bailianhe Pumped Storage Power Station as an example, the problems met during the laying of high fall head cable and their solution is put forward. With comparision with the erection of 110kV/220kV cable terminals processing, it is pointed out that there are lots of merits in the engineering management and schedule control in this 500kV cable project.
出处
《广东输电与变电技术》
2010年第3期42-45,共4页
Guangdong Power Transmission Technology
关键词
高落差电缆
敷设技术
抽水蓄能电站
Cable with high fall head Laying technique Pumped storage power station