期刊文献+

沿海震区榕江大跨越工程基础设计 被引量:1

Design of Rong-jiang Large Span Crossing Tower Foundation in Coastline Seismic Area
下载PDF
导出
摘要 介绍在8度沿海震区群桩基础设计中碰到的技术难点和解决方法。基础设计需要综合考虑安全可靠、经济合理和技术先进,并顾及周围的施工环境和施工难度等因素。该工程采用钻孔灌注桩基础+承台+连梁的设计方案,借助有限元软件进行建模和计算地震作用力、基础连梁梁端弯矩及其应力和地脚螺栓力等。全面优化设计,可为今后同类工程的基础设计提供有价值的参考。 The crux and its solution encountered in the design of group piping foundation in the coast line seismic area of 8^th Richter scale is introduced. The design shall consider the factors of safety and reliability, rational in economy and advance in technology, taking into account the functioning circumstance and difficulties as well. The project applies an engineering scheme of drilling-hole driven cast-in-place pipes + piping platform + linking beams. The calculation of seismic actions, the bending moment of foundation linking beams and footing bolts is done basing on modeling with finite-element soft-ware. The deign subjects to optimization and is worth as the reference for the similar engineering afterward.
作者 王海乔
出处 《广东输电与变电技术》 2010年第3期62-64,共3页 Guangdong Power Transmission Technology
关键词 大跨越 钻孔灌注桩 震陷 连梁 Large crossing Drill-hole driven cast-in-place piping Ground sung Linking beam
  • 相关文献

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部