摘要
以白家疃地震台为实验点,于2008年3月21日完成对该台"九五"前兆仪器针对"十五"台网进行整合改造。通过为期13个月的运行结果可以看出,其改造方案成本低,技术可行,产出数据可靠,为"九五"前兆台站整体接入"十五"管理系统提供了低成本、高效可靠的技术参考。
In this article, a low-lost, highly efficient and reliable technical reference was provided for the "the ninth five-year plan" earthquake precursor station integrating in the "the tenth five- year plan" management system. In March 21, 2008, we had finished the integration of the "the ninth five-year plan" earthquake precursor equipments for "the tenth five-year plan" management system in Baijiatuan earthquake station. Through the result of 13-month continuous running can be seen that this program is with low-cost, technically-feasible and datareliable.
出处
《地震地磁观测与研究》
2010年第2期108-112,共5页
Seismological and Geomagnetic Observation and Research
基金
中国地震局地壳应力研究所基本科研业务专项(J2209830)
关键词
白家疃地震台
台站整体入网
“九五”通信标准
“十五”通信规程
Baijiatuan Seismic Station, station integrating, "the ninth five-year plan" commu nication standards, "the tenth five-year plan" communication order