期刊文献+

杨高路下立交泵站实时监控管理系统的设计与实施

The Design and Implementation of the Real-Time Monitoring and Management System of Yanggao Road Down Grade Separation Pumping Station
下载PDF
导出
摘要 杨高路下立交泵站在10年养护实践中暴露了诸多缺陷,为此实施了技术改造,建立了泵站实时监控管理系统。介绍了系统的网络结构、COMPOBUS总线布线方式和系统PLC控制层与现场设备层的通信。介绍了由人机交流界面菜单组成的实时运行管理系统,以及在上位机组态中利用InTouch与数据库的对接,生成了泵站运行管理拟表。 Many shortcomings of Yanggao Road Down Grade Seperation Pumping Station have exposed during 10 years maintenance practice,so the technical reform has been carried out and a real-time monitoring and managing system has been build up. This paper introduces the network structure of the system,COMPOBUS/S bus method,and the communication between control layer and equipment layer by PLC. Also it introduces the real-time management system of man-machine,and applying In Touch docking with the datebase in PC configuration to generate managing reports about the running of pumping station.
出处 《港口科技》 2010年第4期39-43,共5页 Port Science & Technology
关键词 公路 泵站 实时监控管理系统 设计 实施 highway pump station real-time monitoring and management system design implement
  • 相关文献

参考文献4

  • 1OMRON Compo Bus/S OPERATION MANUAL 上海:OMRON 2003.
  • 2OMRON cx -protocol OPERATION MANUAL 上海:OMRON 2003.
  • 3董永伟.泵站操作工[M].北京:中国劳动社会保障出版社,2004.
  • 4科教工作室.Access 2007数据库应用[M].北京:清华大学出版社,2008.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部