摘要
讨论堰面曲线、直线段、挑射角都已选定的情况下,在可行性研究阶段和初步设计阶段中小型溢流重力坝反弧段确定的简易方法。
At the stage of the feasibility study and primary design of the gravity overflow dam,the simply ways to determine the reverse curve were discussed after the curved surface,the straight segment and the angly of emergence of weir have been fixed.
出处
《南昌水专学报》
1998年第2期48-50,共3页
Journal of Nanchang College of Water Conservancy and Hydroelectric Power
关键词
溢流重力坝
反弧段
几何作图法
解析法
gravity overflow dam
reverse curve
geometric drawing
analytic method