摘要
该文针对李家峡水电厂1#水轮发电机组在初期发电水头下的运行状况,根据青海电力试验研究所对1#机组所做的稳定性试验及现场实测数据,从水力、机械、电磁3个方面分析1#机组的运行情况,为目前状况下1#机组的稳定运行提供理论依据。
Operation Analysis of No.1 Hydropower Generating Unit In Lijiaxia Hydropower Plant Based on measured data in the steady test on the No.1 power generating unit,the paper analyzes the operation of the unit in hydraulic,machinery,electromagnetic aspects to provide a guide for Future operation.
出处
《青海电力》
1998年第3期17-24,共8页
Qinghai Electric Power
关键词
水轮发电机组
运行分析
水力发电厂
Low water head,Generation unit,Analysis,Hydraulic,Machinery,Electromagnetic.