2Loyd East.Application of New Fracturing Technique Improves Stimulation Success for Openhole Horizontal Completions[J].SPE 86480.2004.
3Surjaatmadja J B.Effective Stimulation of Multilateral Completions in the James Lime Formation Achieved by Controlled Individual Placement of Numerous Hydraulic Fractures[J].SPE 82212.2003.
4Machiel Butter.The Potential of Multiple Fractured Horizontal Wells in Layered Reservoirs[J].SPE 102633.2006.
5EastL.Packerless Multistage Fracture-Stimulation Method Using CT Perforating and Annular Path Pumping[J].SPE 96732.2005.
6Surjaatmadja J B.Unconventional Multiple Fracture Treatments Using Dynamic Diversion And Downhole Mixing.SPE 77905.2002.