6A YRES R U ,A YRES L W ,RuADE I. The life cycle of copper, its Co-products and by-products[J].Ming, Minerals and Sus-tainable Development,2003 (24):1-210.
7ORTIZ, OSCAR, CASTELLS, et al. Sustain-ability in the construction industry: a review of recent developments based on LCA[J]. Construction and Building Materials, 2009, 23(1):28-39.
8BENETTO, ENRICO, DUJET, et al. Integrating fuzzy multicriteria analysis and uncertainty evaluation in life cycle assessment[J].Environmental Modelling and Software, 2008, 23(12) :1461-1467.
9LUNDIN M, MORRISSON GM. A life cycle assessment based procedure for development of environmental sustainability indicators for urban water systems[J]. Urban Water ,2002(4) :145-152.
10PENNINGTON D W, POTTING J , F INNVEDEN G, et al. Life cycle assessment Part 2: Current impact assessment p raetice [J].Environ Int, 2004, 30 (5) :721-739.