期刊文献+

连续刚构桥悬臂施工技术研究

The Construction Technology Research on Long Span Continuous Rigid Structure Bridge
下载PDF
导出
摘要 本文给出了预应力混凝土连续刚构箱梁悬臂施工的工艺控制,并对施工中常出现的影响工程质量的一些问题作了深入细致的介绍和探讨。 In this paper, process control of prestressed concrete continuous rigid frame box girder cantilever construction is presented, and some of the problems often affect project quality during the construction are discussed and introduce in detail.
作者 王悦 李姗
出处 《价值工程》 2010年第6期235-235,共1页 Value Engineering
关键词 连续刚构 悬臂施工 工艺控制 continuous rigid frame cantilever construction process control
  • 相关文献

参考文献4

二级参考文献21

  • 1郭金琼 房贞政(等).箱形梁桥剪滞效应分析[J].土木工程学报,1983,16(1):1-13.
  • 2[1]Timoshenko S P, Gere J M. Theory of elastic stability 2nd Ed.[M]. McGraw-Hill, New York, 1961.
  • 3[2]R Dabrowski. Curved thin-walled girders, theory and analysis[M]. Cement and concrete association, London, 1973.
  • 4[3]Yeong Bin Yang and Shyh-Rong Kuo. Static stability of curved thin-walled beams[J]. Journal of Engineering Mechanics, ASCE, 1986, 117(8): 821-841.
  • 5[4]Yeong Bin Yang and Shyh-Rong Kuo. Curved beam element for nonlinear analysis[J]. Journal of Structural Engineering, ASCE, 1989, 115(3): 840-855.
  • 6[7]Kweon JH, Hong CS. An improved arc-length method for post bucking analysis of composite cylindrical panels[J]. Computer and Structures, 1994, 53: 541-549.
  • 7[8]Bathe KJ, Boloourchi S. Large displacement analysis of three-dimension beam structures[J]. International Journal of Numerical Method in Engineering, 1979, 14: 961-986.
  • 8[9]Chen ZQ, Agar TJA. Geometric nonlinear analysis of flexible spatial beam structures[J]. Computer and Structures, 1993, 49(6): 1083-1094.
  • 9[10]Spillers WR. Geometric stiffness matrix for space frame[J]. Computer and Structures, 1990, 36(1): 29-37.
  • 10广东省公路勘察规划设计院.广州南部地区快速路珠江特大桥两阶段初步设计资料[R].,2002..

共引文献61

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部