摘要
通过某医院直线加速器室施工监理实例,介绍如何采取多种有效方法减低大体积混凝土水化热,杜绝出现贯穿裂缝的工艺工序,以及监理在其中发挥的作用。
Through the example for supervisory work in construction of a inear accelerator room in the hospital,introduce how to reduce hydration heat of bulk concrete by variety effective method,how to eradicate the construction technique of appearing through cracks and the role playing of supervisory work in it.
出处
《广东土木与建筑》
2010年第2期37-38,36,共3页
Guangdong Architecture Civil Engineering
关键词
直线加速器室
水化热
温差
linear accelerator room
hydration heat
temperature difference