摘要
综合换乘枢纽的系统配置是换乘枢纽规划设计的核心。本文对综合换乘枢纽系统配置的对象进行分类,以铁路为主导的综合换乘枢纽为例,总结分析目前铁路客站与其他交通方式场站间的常用布局模式,建立布局优化模型,并以成都东(沙河堡)综合交通枢纽为例对模型进行了验证。
The system configuration of integrated transfer hub is the core in the planning and designing of the transfer hub. Based on presenting the object of the transfer hub system configuration, this paper analyzes the eommon layout pattern between railway terminal and the other traffic terminal yards, builds a layout optimization model and also validates the model with an example of Chengdu Shahebao integrated passenger hub.
出处
《高速铁路技术》
2010年第1期6-9,共4页
High Speed Railway Technology
关键词
换乘枢纽
系统配置
系统布局
transfer hub
system configuration
system layout