摘要
通过全面分析影响地浸钻孔涌水量的地质、水文地质及水岩作用过程等因素,从理论上剖析提高地浸钻孔涌水量的方法;通过改善钻孔施工工艺等措施保持和提高矿层的天然渗透性;结合NZ砂岩铀矿床地浸采铀中采取提高钻孔涌水量技术措施的实践,分析各种提高钻孔涌水量技术的适用条件和实际效果,并提出提高地浸钻孔涌水量的改进建议。
Some factors influencing the discharge of in-situ leaching drillholes, including geology, hydrology and water-rock interaction, are discussed systemically, and the measures to reinforce the discharge of in-situ leaching drillholes are analyzed theoretically. It is considered that the original permeability of ore-bearing layer can he kept and enhanced by improving the construction technique of drillholes. Technical measures taken to reinforce the discharge of drillholes in in-situ leaching of NZ sandstone uranium deposit are introduced, various application conditions to reinforce the discharge of drillholes and actual effects are analyzed, and improvement suggestions are put forward, too.
出处
《铀矿冶》
CAS
2010年第2期57-60,69,共5页
Uranium Mining and Metallurgy
基金
国家自然科学基金资助项目(50974057)
关键词
地浸采铀
钻孔涌水量
技术措施
in-situ leaching uranium
discharge of drillholes
technical measure