6USEPA (U. S. Environmental Protection Agency) National Section303 (d) List Fact Sheet[EB/OL] http ://oaspub. epa. gov/waters/national_rept, con trol,2004-04-21.
7USEPA (U. S. Environmental Protection Agency). White Paper (I) : Advantages and Disadvantages of Using Load Duration Curves to Estimate Existing and Allowable Loads for the Development of Nutri- ent TMDLs[EB/OL]. http: //rd. tetratech, eom/ epa,2008.
8Meghna Babbar-Sebens, Karthikeyan R. Considera- tion of Sample Size for Estimating Contaminant Load Reductions Using Load Duration Curves[J]. Journal of Hydrology,2009,372(1-4) :118-123.
9US EPA Office of Wetlands, Oceans Water- sheds. An Approach for Using Load Duration Curves in the Development of TMDLs[EB/OL]. ht- tp://www, epa. gov/owow/tmdl/techsupp, html, 2008-05-28.
10Vogel R M,Fennessey N M. Flow Duration Curves. I: New Interpretation and Confidence Intervals[J]. Journal of Water Resources Planning and Manage- ment,120(4) :485-504.