摘要
本文以松原大桥施工控制测量的设计与实施为基础。重点阐述了该项目控制测量设计与实施的基本思想,通过计算分析论证证明采用GPS观测方法和精密水准测量方法相配合完全能达到桥梁施工的需要。
This paper, based on the design and implementation of the control survey of Songyuan Bridge, mainly expounds the basic idea of the design and implementation of control survey, and proved the combining GPS and precise leveling observation method fully matched the needs of bridge construction.
出处
《吉林水利》
2010年第5期103-105,共3页
Jilin Water Resources
关键词
桥梁施工控制测量
设计思想
实施
the control survey of bridge construction
design
implementation