期刊文献+

基于逆向分层的网格工作流调度改进算法

Improving Bottom Level Based Heuristic for Workflow Scheduling in Grids
下载PDF
导出
摘要 通过对逆向分层DBL(Deadline Bottom level BL)算法的分析与研究,发现当截止期(δn)大于BLmin的情况下,其对逆向分层浮差(Tws)分配上有不足之处。为此该文提出了一种改进算法DBL-LC(DeadlineBottomlevel-lowercost)。改进算法使得对逆向分层浮差(Tws)的使用更加充分,减少了流时间碎片。实验证明,在相同的截止期下DBL-LC执行费用比DBL算法平均降低了14.52%。 By analyzing DBL (Deadline Bottom Level) algorithm,there is unreasonable problem in allocating Tws when δnBLmin. Regarding this problem,a improving algorithm called DBL-LC (deadline bottom level-lower cost) algorithm is proposed. Improving algorithm makes good use of Tws and reduces shattering time of workflow. Experimental results show that at same workflow deadline,comparing DBL algorithm,DBL-LC algorithm averagely save 14.52% cost.
作者 滕海涛 卡米力·木依丁 石刚 汪明军 TENG Hai-tao,MUYIDING·Kamili,SHI Gang,WANG Ming-jun (School of Information Science and Engineering,Xinjiang University,Urumqi 830046,China)
出处 《电脑知识与技术》 2010年第3期1576-1579,共4页 Computer Knowledge and Technology
关键词 DBL 改进 DBL-LC 层扩展时间 DBL improving DBL-LC level extend time
  • 相关文献

参考文献9

  • 1Foster I,Kesselman C,Tuecke S.The Anatomy of the Grid:Enabling Scalable Virtual Organizations[J].International J.Supercomputer Application,2001,15(3):200-222.
  • 2Foster I,Kesselman C.The Grid:Blueprint for a Future Computing Infrastructure[M].USA:Morgan Kaufmann Publishers,1999.
  • 3Foster I,Kesselman C,Nick J M,et al.Grid service for distributed system integration[J].IggE Computer,2002,35(6):37-46.
  • 4Blythe J,jain S,Deelman E,et al.Task scheduling strategies for workflowbased applications in grids//proceedings of the IEEE International Symposium on Cluster Computing and Grid[M].Cardiff,Wales,UK,2005:759-767.
  • 5Buyya R,Abramson D,Giddy Let al.Economie models for resource management and scheduling in grid computing[J].Coneurreney and Computation:Practice and Experience Journal (Special Issue on Grid Computing Environments),2002,14(13-15):1507-1542.
  • 6Abramson D,Buyya R,Giddy J.A computational economy for grid computing and its Implementation in the Nimrod-G resource broker[J].Future Gendration Computer Systems(FGCS) Journal,2002,18(8):1061-1074.
  • 7Yu J,Buyya R,Tham C K.Cost-based Scheduling of work-flow applications on utility grids//Proceedings of the 1st IEEE International Conference on e-Sceenee and Grid Computing[M].Melbourne,Australia:IEEE press,2005:140-147.
  • 8苑迎春,李小平,王茜,张毅.基于逆向分层的网格工作流调度算法[J].计算机学报,2008,31(2):282-290. 被引量:51
  • 9苑迎春,李小平,王茜.基于串归约的网格工作流费用优化方法[J].计算机研究与发展,2008,45(2):246-253. 被引量:22

二级参考文献28

  • 1金海,陈汉华,吕志鹏,宁小敏.CGSP作业管理器合成服务的QoS优化模型及求解[J].计算机学报,2005,28(4):578-588. 被引量:53
  • 2陈宏伟,王汝传.费用-时间优化的网格有向无环图调度算法[J].电子学报,2005,33(8):1375-1380. 被引量:14
  • 3王勇,胡春明,杜宗霞.服务质量感知的网格工作流调度[J].软件学报,2006,17(11):2341-2351. 被引量:60
  • 4张伟哲,胡铭曾,张宏莉,刘凯鹏.多QoS约束网格作业调度问题的多目标演化算法[J].计算机研究与发展,2006,43(11):1855-1862. 被引量:23
  • 5Foster I, Kesselman C. The Grid: Blueprint for a Future Computing Infrastructure. USA: Morgan Kaufmann Publishers, 1999
  • 6Foster I, Kesselman C, Nick J M, Tuecke S. Grid service for distributed system integration. IEEE Computer, 2002, 35(6) : 37-46
  • 7Deelman E, Blythe Jet al. Mapping abstract complex workflows onto grid environments. Journal of Grid Computing. 2003, 1(1): 25-39
  • 8Yu J, Buyya R. Taxonomy of scientific workflow systems for Grid computing. Sigmod Record, 2005, 34(3): 44-49
  • 9Blythe J, Jain S, Deelman E et al. Task scheduling strategies for workflow-based applications in grids//Proceedings of the IEEE International Symposium on Cluster Computing and Grid. Cardiff, Wales, UK, 2005:759-767
  • 10Frey J, Tannenbaum T et al. Condor-G: A computation management agent for multi-institutional grids. Cluster Computing, 2002, 5(3):237-246

共引文献56

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部