摘要
结合某液化天然气(LNG)气化站工程实践,探讨了LNG气化站氮气预冷和天然气置换的方案、操作要点和经验。
Combined with the engineering practice of a LNG Vaporizing station, the nitrogen precooling and NG conversion scheme of LNG vaporizing station, the operation points and experience are discussed.
出处
《煤气与热力》
2010年第5期9-13,共5页
Gas & Heat
关键词
液化天然气
气化站
预冷
置换
liquefied natural gas (LNG)
vaporizing station
precooling
conversion