TSP203系统在永九快速线永龙隧道超前地质预报中的应用 被引量:2

TSP203 System Application on Yonglong Tunnel,Yongjiu Quick Line Advanced Geological Forecast
下载PDF
导出
摘要 本文通过永龙隧道A标段YK1+480~YK1+600段超前地质预报的应用实例,介绍了TSP203系统在永龙隧道超前地质预报工作中的应用,具体阐述了TSP203系统的基本原理及特点、数据采集、数据处理与分析、探测结论和围岩实际开挖情况对比分析。为确保隧道安全持续挖进,确定隧道施工工艺,合理变更设计和施工计划提供了依据。 Through an application example for advanced geological forecast at Yonglong tunnel section A YK1 + 480-YK1 +600, it introduces TSP203 working system' s application in Yonglong tunnel advanced geological forecast and state basic principle with characteristics, data acquisition, data processing and analysis, the detection conclusion and surrounding rock actual excavation situation with analysis for TP203 system. Provide the basis on ensure tunnel safety with continue to digging, tunnel construction craft, reasonable design changes and construction plan.
作者 廖升权
出处 《广州建筑》 2010年第2期27-29,共3页 GUANGZHOU ARCHITECTURE
关键词 永龙隧道 超前地质预报 TSP203 Yonglong Tunnel advanced geological forecast TSP203
  • 相关文献

参考文献3

二级参考文献4

  • 1[4]Thomas Dickmann,Rata Awasthi. The Tunnel Seismic Prediction Method and its Impact on Logistic Optimisation in Tunnelling. Proceedings of the International Conference on Rock Engineering Techniques for Site Characterisation, Bangalore, India,Dec. 1999, 6~8.
  • 2[5]Xiao Shuan, Sattel G. Advance seismic prediction in tunnel construction-a new TSP surveying system in use in the Vereina Tunnel, Switzerland. Presented by International Symposium on New Development in Rock Mechanics and Engineering, Shenyang, P. R.China, Oct 1994.
  • 3赵勇,肖书安,刘志刚.TSP超前地质预报系统在隧道工程中的应用[J].铁道建筑技术,2003(5):18-22. 被引量:59
  • 4温树林,吴世林.TSP203在云南元磨高速公路隧道超前地质预报中的应用[J].地球物理学进展,2003,18(3):465-471. 被引量:79

共引文献142

同被引文献12

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部