期刊文献+

自动化制造单元最小完工时间调度问题的混合启发式算法 被引量:10

Hybrid heuristic algorithm for the scheduling problem in robotic cell with makespan criterion
下载PDF
导出
摘要 自动化制造单元最小完工时间调度问题属于NP-hard难题,目前尚缺乏有效的调度方法。为此,提出基于遗传和禁忌搜索的混合启发式算法,用以搜索一组最满意的机器人搬运作业排序。以遗传算法为基本结构,在初始种群产生和交叉、变异操作中引入禁忌搜索技术,以提高优化质量。基于搬运作业规则的初始种群构造算法和两阶段交叉、变异算子克服了传统算子对可行搬运作业排序的破坏,而邻域移动算子则保证了禁忌搜索的多样性和集中性。最后,随机实验结果验证了算法的有效性。 There was no effective scheduling methods for the makespan scheduling problem in robotic cell,which was a NP-hard problem.A hybrid heuristic algorithm based on gentic algorithm and tabu search was proposed to search the optimal robot moving sequence for this problem.This algorithm borrowed basic structures of the genetic algorithm,and tabu search was introduced after the generation of initial population,crossover and mutation operations to improve the qualities of the solutions.Besides,a constructive heuristic method and two-phase crossover and mutation operations were respectively designed to overcome the faults of the traditional operations.A move operation was proposed to reach the neighborhood in the tabu search to guarantee the diversification and intensification.Finally,computation results based on the randomly generated instances indicated the effectiveness of this algorithm.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2010年第4期847-854,共8页 Computer Integrated Manufacturing Systems
基金 新世纪优秀人才支持计划资助项目(NCET-05-0864) 国家自然科学基金资助项目(50605052)~~
关键词 自动化制造单元 最小完工时间 调度 混合启发式算法 robotic cell makespan scheduling hybrid heuristic algorithm
  • 相关文献

参考文献24

  • 1CRAMA Y,KATS V,VAN DE KLUNDERT J,et al.Cyclic scheduling in robotic flowshops[J].Annals of Operations Research,2000,96(1/4):97-124.
  • 2DAWANDE M,GEISMAR H N,SETHI S P,et al.Sequencing and scheduling in robotic cells:recent developments[J].Journal of Scheduling,2005,8(5):387-426.
  • 3LEI L,WANG T J.A proof:the cyclic hoist scheduling problem is NP-hard[M]//Working Paper.Rutgers,N.J.,USA,Rutgers University,1989:# 89-0016.
  • 4PHILLIPS L W,UNGER P S.Mathematical programming solution of a hoist scheduling program[J].HE Transactions,1976,8(2):219-225.
  • 5LIU Jiyin,JIANG Yun,ZHOU Zhili.Cyclic scheduling of a single hoist in extended electroplating lines,a comprehensive integer programming solution[J].HE Transactions,2002,34(10),905-914.
  • 6SHAPIRO G W,NUTTLE H W.Hoist scheduling for a PCB electroplating facility[J].HE Transactions,1988,20(2); 157-167.
  • 7CHEN Haoxun,CHU Chengbin,PROTH J M.Cyclic scheduling of a hoist with time window constraints[J].IEEE Transactions on Robotics and Automation,1998,14(1):144-152.
  • 8CHE Ada,CHU Chengbin.Multi-degree cyclic scheduling of two robots in a no-wait flowshop[J].IEEE Transactions on Automation Science and Engineering,2005,2(2),173-183.
  • 9CHE Ada,CHU Chengbin.Cyclic hoist scheduling in large reallife electroplating lines[J].OR Spectrum,2007,29(3),445-470.
  • 10CHE Ada,CHU Chengbin.Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots[J],European Journal of Operational Research,2009,199(1),77-88.

二级参考文献47

  • 1吴秀丽,孙树栋,余建军,蔡志强.多目标柔性作业车间调度决策精选机制研究[J].中国机械工程,2007,18(2):161-165. 被引量:16
  • 2Dawande M,Geismar H N,Sethi S P, Sriskandarajah C. Sequencing and scheduling in robotic cells: recent developments[J].Journal of Scheduling, 2005,8 (5) 387- 426.
  • 3Phillips L W,Unger P S. Mathematical programming solution of a hoist scheduling program [J]. AIIE Transactions, 1976,8 (2) : 219 - 225.
  • 4Lei L, Wang T J. A proof: the cyclic hoist scheduling problem is NP-hard [Z]. Rutgers University, 1989.
  • 5Shapiro G W, Nuttle H W. Hoist scheduling for a PCB electroplating facility [J]. IIE Transactions, 1988,20(2) : 157-167.
  • 6Lei L, Wang T J. Determining optimal cyclic hoist schedules in a single-hoist electroplating line[J].IIE Transactions, 1994,26 (2) : 25-33.
  • 7Chen H, Chu C, Proth J M. Cyclic scheduling of a hoist with time window constraints[J]. IEEE Transactions on Robotics and Automation, 1998, 14 (1) : 144-152.
  • 8Liu J, Jiang Y, Zhou Z. Cyclic scheduling of a single hoist in extended electroplating lines: a comprehensive integer programming solution[J], IIE Transactions, 2002,34 : 905-914.
  • 9Che A D, Chu C B. Cyclic hoist scheduling in large real-life electroplating lines[J].OR Spectrum,2007, 29(3) : 445-470.
  • 10Levner E, Kats V, Levit V E. An improved algorithm for cyclic scheduling in a robotic cell[J].European Journal of Operational Research, 1997, 97(3) :500-508.

共引文献41

同被引文献98

引证文献10

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部