摘要
结合工程实例,通过方案比选,探讨了岩溶地区人工挖孔灌注桩基础的应用,介绍了施工方案,并对设计及施工中产生的问题和技术难点进行了分析,以保证岩溶地区基础工程施工质量。
Based on project cases and through scheme comparison,this paper discussed the application of manual digging pile in karst area,introduced construction scheme.Moreover,the analysis of problems and technology difficulties in design and construction is carried out,so as to ensure the quality of the construction of foundation works in karst area.
出处
《山西建筑》
2010年第15期94-95,共2页
Shanxi Architecture
关键词
人工挖孔桩
岩溶地区
方案比选
施工方案
manual digging pile
karst area
scheme comparison
construction scheme