结合新建铁路兰州至乌鲁木齐第二双线沿线电力电网资源分布情况,对其施工用电方案进行了分析研究,提出了铁路工程施工用电方案的选择与计算方法,从而为类似项目施工用电方案设计与计算提供指导。
By combining with the distribution situation of power network resource along the second double line of the newly built railway from Lanzhou to Urumchi,the paper analyzes its scheme for the power supply of the construction,and points out the selection of the construction power supply in the railway project and its calculation method,so as to provide the direction for the design and calculation of the power supply scheme in similar projects.
出处
《山西建筑》
2010年第15期177-178,共2页
Shanxi Architecture
关键词
铁路工程
施工用电
方案比选
计算
railway project
construction power
scheme comparison