摘要
分析了出现工程变更的主要原因,并从做好设计优化、做细图纸会审、加强变更管理三个方面阐述了工程变更的控制办法,对于控制工程变更,降低工程成本具有一定的指导意义。
The paper analyzes the main reasons for engineering changes,illustrates the controlling methods for engineering changes from the design optimization,detailed graphic check and strengthened change management,so as to have certain direction meaning for reducing engineering costs for the engineering changes.
出处
《山西建筑》
2010年第15期193-194,共2页
Shanxi Architecture
关键词
工程变更
控制办法
措施
图纸会审
engineering changes
controlling methods
measures
graphic checking