摘要
结合工程实例,分析介绍了长沙市三汊矶湘江大桥东岸边孔预应力混凝土箱梁顶推施工技术方案,从临时设施、梁段顶推、施工监测三方面对顶推施工技术及质量控制措施进行了详细阐述,以指导实践。
Combined with engineering example,the east bank pore prestressed concrete box beam incremental launching construction technical program of Sanchaji Xiangjiang Bridge was analyzed and introduced,it was detail illustrated from temporary facility,beam incremental launching and construction monitoring so as to guide practice.
出处
《山西建筑》
2010年第15期317-318,共2页
Shanxi Architecture
关键词
桥梁施工
箱梁顶推
施工技术
bridge construction
box beam incremental launching
construction technique