摘要
PHC管桩施工具有速度快,效果好,投资省的特点。本文以厦门港嵩屿港区二期工程后轨道梁Φ600PHC管桩(AB型)基础试桩为实例,探讨PHC管桩在重力式码头工程后轨道梁基础中应用的可行性。
PHC pile with rapid construction progress,good result,reduced cost.In the section-A Quay wall Project of Songyu Port Area of Xiamen of after this track beam φ600PHC pipe(ABtype)-based test pile as an example to explore PHC pile wharf construction of gravity-based track beam upon the feasibility of the application.
出处
《福建建筑》
2010年第5期88-90,93,共4页
Fujian Architecture & Construction