摘要
蒲石河抽水蓄能电站上水库混凝土面板堆石坝地处寒冷地区,针对面板混凝土的裂缝控制,在填筑质量、材料质量和施工质量等方面提出了具体控制措施。
The concrete face rock-fill dam of the upper reservoir for Pushihe Pumped Storage Hydropwer Station is located in a cold region, and then some specific measures in the aspects such as filling quality, material quality, construction quality, etc. for the cracking control on the concrete face slab are put forward herein.
出处
《水利水电技术》
CSCD
北大核心
2010年第5期7-9,共3页
Water Resources and Hydropower Engineering
关键词
混凝土面板堆石坝
上水库
面板施工
裂缝
控制措施
蒲石河抽水蓄能电站
concrete face rock-fill dam
upper reservoir
slab construction
crack
control Storage Hydropwer Station
Pushihe Pumped