糯扎渡心墙堆石坝填筑施工质量控制 被引量:1

Fill construction quality control of gravel-soil core rockfill dam of Nuozhadu Hydropower Station
下载PDF
导出
摘要 糯扎渡水电站大坝为中央直立掺砾石土心墙堆石坝,坝高261.5 m,坝顶长630.06 m,施工过程中采用了数字大坝监控系统和附加质量法等先进的质量控制技术,工程质量处于良好的受控状态。本文详细介绍了施工过程的质量控制方法及技术,为类似工程施工借鉴及参考。 The dam of Nuozhadu Hydropower Station is a rockfill dam with a central-vertical gravel-soil core. During the construction of the dam, the advanced quality control techniques of the digital dam construction monitoring system and additional mass method are adopted, and then the dam is constructed under a better controlled condition all the time. The method and technology for the construction quality control are described in detail herein, so as to provide some references for the similar projects.
出处 《水利水电技术》 CSCD 北大核心 2010年第5期18-22,共5页 Water Resources and Hydropower Engineering
关键词 质量控制 施工 心墙堆石坝 糯扎渡水电站 quality control fill construction core rockfill dam Nuozhadu Hydropower Station
  • 相关文献

同被引文献10

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部