摘要 多年以来,白山水库渗漏现象非常严重,虽然经过多次加固处理,但渗漏问题依然没有得到很好的控制。白山水库水文地质条件复杂,进行加固处理并不是件容易的事情。本文根据白山水库现有的水文地质资料,结合目前工程的现状,对地基和坝体进行了渗流和稳定计算,并根据渗流和稳定计算结果分析地基和坝体渗漏的原因,提出切实可行的除险加固优化方案。 Over the years, the seepage phenomenons of Baishan reservoir are very serious. Despite of frequent reinforcements, the leakage still has not been under good control. Due to the complicated hydro-geological conditions of Baishan reservoir, it’s hard to carry out reinforcement measures. According to the existing hydro-geological data and combing with the present status of the project, the paper calculates seepage and stability of both the foundation and body of the dam, and analyses the cause of the seepage. Based on the results of calcu- lation, feasible reinforcement optimum proposal have been put forward.
机构地区 大连理工大学
出处 《东北水利水电》 2010年第5期3-4,10,共3页 Water Resources & Hydropower of Northeast China
关键词 渗流 抗滑稳定 除险加固 白山水库 seepage antisliding stability reinforcement Baishan Reservoir
  • 相关文献

同被引文献2

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部