摘要
镇宁县桂家湖水库大坝加高工程,主坝的两坝肩及4#副坝,设计为均质土坝,因选定料场中的土料含水量较高,贵州阴雨天较多,土料翻晒困难,难于满足填筑的质量和进度要求,为解决这一问题,经技术论证采用风化料代替粘土料进行大坝填筑施工,取得良好的效果。
In the work of dam elevation of GuiJia lake at Zhenning county, two abutments of main dam and No.4 auxiliary dam should be bomogeneous earth dam in terms of the scheme. However, clay material in selected site can not meet the requirement in both quality and time schedule due to the reason that clay material with higher water content is difficult to turn it over for basking during much more rainy days in Guizhou. In order to solve this issue, it is suggested through technical demonstration that weathering material be used to substitute clay material in the construction of dam placement. It is apparent that effect is satisfactory.
出处
《贵州师范大学学报(自然科学版)》
CAS
1999年第1期72-76,共5页
Journal of Guizhou Normal University:Natural Sciences
关键词
土料
风化料
填筑施工
粘土料
大坝
加高工程
Clay material, Weathering material, Comparison and analysis, Advantage, Construction, Placement