期刊文献+

平均维修保障等待时间的计算方法 被引量:3

Calculation methods for mean waiting time of maintenance support
下载PDF
导出
摘要 阐述了装备保障系统维修保障等待时间的概念内涵,分析了研制阶段保障方案的设计过程中维修保障等待时间的影响因素,以研制阶段保障分析的结果为输入,运用概率论和矩阵论给出了平均维修保障等待时间的计算方法,为研制阶段保障系统及时性的分析和评价提供依据.给出一个算例,验证了计算方法的可行性与合理性. In order to analyze and evaluate the timeliness of the support system during the design and development phase,the concept of waiting time of maintenance support(WTMS) was discussed.The impact factors of WTMS during the design process of the support system for the equipment was analyzed,including the frequency and location of the support activities,depth of maintenance of the support sites with different lines of maintenance,distribution of the support sites and allocation of the support resources in them,transportation means between different support sites and other factors.A calculation method for the mean waiting time of maintenance support was established based on statistics and matrix theory,which used the results of supportability analysis as input and considered the difference in calculation methods between the consuming support resources and occupying support resources.A case of the calculation method was provided to verify its feasibility and correctness.
出处 《北京航空航天大学学报》 EI CAS CSCD 北大核心 2010年第4期451-454,468,共5页 Journal of Beijing University of Aeronautics and Astronautics
关键词 装备 保障系统 保障分析 及时性 维修保障 等待时间 equipment support system supportability analysis timeliness maintenance waiting time
  • 相关文献

参考文献12

  • 1Wing Thomas E ,Crow Larry H. A model for mean-time-to-repair and mean-logistics-delay-time at the system level[ C ]// Annual Reliability and Maintainability Symposium. Los Angeles: 1EEE, 1990:389 - 393.
  • 2Wing Thomas E, Crow Larry H, Dreckman G Thomas. The effect of redundancy on the requirement for logistic support[ C]//Annual Reliability and Maintainability Symposium. Orlando: IEEE, 1991:411 -415.
  • 3Booth Gregory L. An analysis of logistics response times for requisitions of naval aviation repairable items [ M ]. Monterey, California: Naval Postgraduate School ,2002 : 1 - 101.
  • 4Inspector General Dept of Defense Arlington VA. Logistics response time for the direct vendor delivery process, defense supply center, Columbus[R]. ADA367164,1999.
  • 5Fortunato Edward T, Eanes John T. Reducing the transportation segment of logistics response time[R]. ADA3134988,1996.
  • 6Wang N C, Kang R. Analyzing of spares inventory management policy based on the analytic hierarchy process [ C ]// ESREL2007 ( Risk, Reliability and Societal Safety). Stavanger : University Stavanger,2007:2037 - 2043.
  • 7程海龙,康锐,韦艺,曲丽丽.备件满足率与备件短缺量对比分析[J].北京航空航天大学学报,2008,34(5):580-583. 被引量:13
  • 8Alfredsson P. Optimization of multi-echelon repairable item inventory systems with simultaneous location of repair facilities [ J]. European Journal of Operational Research, 1997,99:584 - 595.
  • 9Diaz A,Fu M C. Models for multi-echelon repairable item inventory systems with limited repair capacity[ J ]. European Journal of Operational Research, 1997,97:480 - 492.
  • 10Blanchard Benjamin S. Logistics engineering and management [ M ]. 6th ed. New Jersey : Pearson Prentice Hall, 2003 : 353 - 356.

二级参考文献5

  • 1Rczaci J. Economic order quantity model with backordcr for imperfect quality items [ C ]//Proceedings of the Engineering Management Conference. Washington DC : IEEE Press ,2005,9 (2) : 466 - 470
  • 2Christopher M Adams. Inventory optimization techniques, system vs. item level inventory analysis [ M ]. Raytheon Company: IEEE ,2004 :55 - 59
  • 3Craig C Sherbrooke. Optimal inventory modeling of systems [ M]. Boston/ Dordrecht/ London: Kluwer Academic Publishers ,2004 : 24 - 25,30 - 33
  • 4杨秉喜,李金国,张义芳,等.GJB4355《备件供应规划要求》实施指南[M].北京:总装备部技术基础管理中心,2006:46-47,50-51
  • 5道格拉斯·奥斯本.备件管理[M].贺步杰译.北京:蓝天出版社,2005:203-204

共引文献12

同被引文献40

引证文献3

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部