期刊文献+

飞机复合材料车间计划排产优化方法的研究 被引量:4

Research on Planning Scheduling Method in Aircraft Composite Material Workshop
下载PDF
导出
摘要 结合国内某飞机复合材料制造车间的实际生产特点,提出了针对复合材料车间计划排产的方法和步骤,并建立了基于启发式规则算法的优化排产模型。该排产方法将生产班组作为相对独立的生产单元,在设计上不仅充分考虑到复合材料生产的特点,而且对生产中出现的突发问题进行了相应的调整处理,使得排产方法更加适应复合材料生产的实际情况,最终提高了车间的生产效率。 The methods and processes of planning schedule in the composite material workshop are given and relatively optimized scheduling function based on heuristic algorithm according to the reality of one of China aviation composite material workshop is established. This algorithm regards each of the production teams as a relatively independent unit. The algorithm is designed not only considering the characteristics of the production of composite material, but also dealing with sudden emergency, making the algorithm more practicable in the actual situation of the composite material workshop, and ultimately improve the productivity of the workshop.
出处 《航空制造技术》 2010年第9期68-72,共5页 Aeronautical Manufacturing Technology
关键词 复合材料 计划调度 启发式规则算法 排产算法 Composite material Planning scheduling Heuristic algorithm Scheduling algorithm
  • 相关文献

参考文献3

二级参考文献21

  • 1汤和,袁俊良.计算机辅助作业计划的启发式方法及其应用[J].天津大学学报,1994,27(4):454-459. 被引量:5
  • 2梁波,李怀祖,孙林岩.生产作业计划理论及应用的评述[J].系统工程理论方法应用,1996,5(2):9-17. 被引量:12
  • 3J.R.金(英国) 刘绍汤 等.生产计划与控制[M].机械工业出版社,1988.11.
  • 4Garey E L, Johnson D S, Sethi R.The Complexity of Flowshop and Jobshop Scheduling.Maths.Ops.Res.,1976, 1:117~129.
  • 5Kim S, Bobrowski P.Impact of Sequence-dependent Setup Time on Jobshop Scheduling Performance.International Journal of Production Research,1992,32:1503~1520.
  • 6Aanen E, Gaalman C, Nawijn W.A Scheduling Approach for a Flexible Manufacturing System.International Journal of Production Research,1993,31:2369~2385.
  • 7Zhou C, Egbelu P J.Scheduling in a Manufacturing Shop with Sequence-dependent Setups.Robotics and Computer Integrated Manufacturing,1989,5:73~81.
  • 8Choi I C, Korkmaz O.Job Shop Scheduling with Separable Sequence Dependent Setups.Annals of Operations Research,1997,70:155~170.
  • 9Lawrence S.Resource Constrained Project Scheduling:an Experimental Investigation of Heuristic Scheduling Techniques (Supplement).Pittsburgh, Pennsylvania:Graduate School of Industrial Administration, Carnegie-Mellon University,1984.
  • 10SIMUL8 Corporation.Simul8,一个可视化的离散系统仿真软件[CP/OL].[2005-4-28].http:/ /www.simul8.com/.

共引文献8

同被引文献21

引证文献4

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部