1Kelly R. Tilford. Impact of Environmental Contamination on Construction Projects. Journal of Management in Engineering.Jan2000, 126 (1): 45-51.
2Therivel R. And Partidario M. R. Introduction. In The Practice of Strategic Environmental Assessment. London. 1996(15).
3Anderson, Stuart D. Fisher, Deborah J. Rahman, Suhel P..Integrating Constructability into Project Development: A Process Approach. Journal of Construction Engineering and Management. 2000, 126 (2).
4M. Robert. Project Performance Control in Reconstruction Projects. Journal of Construction Engineering and Management.2000, 126 (2): 137 ~" 141.
5Gawthrop, Peter. Environment for specification, design, operation, maintetmnce, and revision of manufacturing control systems. IEE Conference Publication. Mar 1990:104-110.
6D. K. H. Chua, P. K. Loh. Critical Success Factors for Different Project Objectives. Journal of Construction Engineering and Management. 1999, 5- 6.
7Project Management Institute, A Guide to The Project Management Body of Knowledge, PMI Standard Committee, 2000.
8Fleming, Quentin W., Cost/Schedule Control Systems Criteria: The Management Guide to C/SCSC, Chicago, Illinois: Probus Publishing Company, 1992.
9Navy, Special Projects Office, Bureau of Ordnance, Department of the Nevy, Project PERT, Washington DC. 1958.
10NASA, Office of the Secretary of Defense and National Aeronautic and Space Administration. DOD and NASA Guide PERT/COST, Washington, DC. 1962.