摘要
苏州金民东路车站施工旋喷止水帷幕部分失效,基坑出现渗漏、涌砂现象,采取基坑内堵水,坑外管井降水的方案予以处理。
The water-stop curtain of high-pressure rotary spraying pile in Jinmin East Road station,Suzhou partially failure and foundation pit has the phenomena of seepage andsand gushing,water shutoff in the pit and dewatering outside the pit are adopt to deal with.
出处
《价值工程》
2010年第9期100-100,共1页
Value Engineering
关键词
旋喷桩
渗漏
堵水
管井降水
rotary spraying pile
leakage
water control
dewatering