期刊文献+

带有预防性维修中断的复合制造系统的经济批量问题 被引量:3

Economic Lot Sizing Problems for Integrated Manufacturing System with Preventive Maintenance Interruption
下载PDF
导出
摘要 本文研究了由单个产品和单种原材料组成的复合制造系统在实行预防性维修中断(PreventiveMaintenanceInteruption,PMI)的情形下的经济批量问题。发展了一个复合批量模型,提供了寻求最优生产批量、原材料最优订货批量以及最优维修中断次数的简单算法,并用数值例子说明了模型的求解过程。 In this paper,economic lot sizing problems for the integrated manufacturing system consisting of a single product and a single material are considered under the situation of performing preventive maintenance interruption.An integrated lot size model is developed.A simple algorithm is provided for finding the optimal production lot size,the optimal order lot size and the optimal number of maintenance interruption.Some numerical examples are used to illustrate how the model works.
作者 周永务
出处 《系统工程与电子技术》 EI CSCD 1999年第2期19-23,38,共6页 Systems Engineering and Electronics
关键词 维修 中断管理 原材料 复合制造系统 预防性 Preventive maintenance interruption,Material,Inventory.
  • 相关文献

参考文献5

共引文献7

同被引文献19

  • 1Smith P H. Optimal production policy for items with decreasing demand[J]. European Journal of Operational Research, 1976, 1:365-367..
  • 2Hong J D, Hayya J C. On an ( s, Q) production policy for an integrated inventory model for a single product with linearly increasing demand[J].Journal of Operational Research Society,1990,41:931-941.
  • 3Zhou Y W. Optimal production policy for an item with shortages and increasing time-varying demand[ J]. Journal of operational Researth society, 1996, 47: 1175-1183.
  • 4Yan H, Cheng T C E. Optimal production stopping and restarting times for an EOQ model with deteriorating items[ J]. Jounal of Operational Research Society, 1998, 49: 1288-1295.
  • 5Schonberger R J, Knkd E M. Operations Management: Continuous Improvement[M]. 5th Edition. Irwin: Burr Ridge, 1994.
  • 6Groenevelt H, Printelon L, Seidmann A. Production batching with machine breakdowns and safety stock[J]. Operations Research,1992, 40: 959-971.
  • 7Groenevelt H, Printelon L, Seidmann A. Production lot sizing with machine breakdowns[ J]. Management Scienece, 1992, 38:104-123.
  • 8文晓巍,张光辉.随机生产状态下易变质产品的EPQ模型[J].中国管理科学,2009,(10).
  • 9Iravani S. M. R. , Duenyas I. , Integrated maintenance and production control of a deteriorating production sys- tem [ J ]. lie Transactions, 2002, 34 (5) :423 - 435.
  • 10Berrichi A. , Amodeo L. , Yalaoui F. , Chttelet E. , Mezghiche M. , Bi - objective optimation algorithms for joint production and maintenance scheduling: application to the parallel machine problem [ J ]. Journal of Intelli- gent Manufacturing, 2009, 20(4) : 389 -400.

引证文献3

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部